Structured on-site technical survey
- In-house coordinationPartial
Depends entirely on the in-house coordinator's background.
- Generic testing laboratoryNot covered
Not typically included in a standalone sample submission.
- Legionella Analysis ItalyCovered
Structured survey covering storage tanks, dead-legs and recirculation loops.